EPCOR Case Study

  • November 24, 2016
  • by Consentia

EPCOR HR was moving from EPCOR Centre to its new location in EPCOR Tower. As a result, filing storage space was being reduced while the cost of storage was increasing. EPCOR needed a solution to solve these issues and increase process and worker efficiency. This case study presents on Consentia accomplished this for EPCOR.